All equipment and installations installed pursuant to this division shall be inspected
by the building official, or a special inspector designated and approved by the building
official. Inspections shall be made during construction and before enclosure or concealment
of any equipment and accessory materials. Final inspection and operating tests shall
be made before unconditional occupancy of the building is permitted. Final test reports
must be submitted with final inspection.