The construction or installation of any clear water sump pit shall include the installation of a sump pump and sump pump discharge lines which meet the requirements of sections 10-464(a) and 16-95(3) and all applicable codes.
(Code 1970; Code 1992, § 445.09; Ord. No. 431; Ord. No. 431-A1, 2-18-1976; Ord. No. 431-A2, 11-3-1976; Ord. No. 431-A3, 5-13-1981; Ord. No. 431-A4, 12-2-1981; Ord. No. 1998-1, 3-16-1998; Ord. No. 2000-10, 10-17-2000; Ord. No. 2005-06, 6-21-2005)